QMS Structural Condition Audit

Footings & Attachment Points

A1: Concrete Footing or Wall Condition
A2: Base/Attachment Plate(s)
A3: Hold-down/Anchor Bolts & Nuts
A4: Grout & Sealant

B: Primary Structure including Columns, Posts, Headstocks & Main Beams

B1: Main Columns or Posts
B2: Headstock/Main Beam

C: Secondary Steelwork, Bracing and Connections

C1: Crossbeams

C2: Uprights

C3: Structural Bolts & Fixings
D: LED Modules

E: Cladding, Panels & Fixings

E1: Cladding
E2: Panels

E3: Paint & Galvanising

F: ID Branding Light Box/Panel

G: Fall Arrest & Safety Systems

G1: Vertical Lines
G2: Horizontal Lines
G3: Anchor Points

H: Ladders, Walkways & Handrails

H1: Ladder/s
H2: Lower Walkway
H3: Upper Walkway
H4: Handrails

I: Crane/Lifting Device

Overall

Signature & Date